Use case · Moving to a new ERP

Moving to a new ERP? What goes into it on day one?

“Most ERP programmes pass every technical test and still leave Finance unable to trust the numbers.”

High Volume Accounting Live, with Marinda van Harskamp
Go-live board · New ERPPlanned
  1. The system is liveEvery technical test passed.
    —
  2. The invoices flowSales and purchase invoices post.
    —
  3. The GL closesThe first period closes on the new chart of accounts.
    —
  4. Finance trusts the numbersNot started.
    —

Press Go live and watch which line stays open.

Illustrative go-live, after the High Volume Accounting Live episode “ERP can go live. Finance never does.”

Day one

The new ledger starts empty. You decide what goes in first.

“The general ledger should only receive what has been reconciled. Raw events do not belong there.” From the Actuals blog

Switch to see what each choice leaves in the ledger.

Lines posted0
Unexplained0
Traceable to source—

Illustrative figures for one day of a high-volume webshop.

Before the ERP

ERPs record numbers. They do not check them.

“Every mainstream ERP, whether SAP, Oracle, NetSuite, Exact or Dynamics, was engineered around one assumption. Transaction data arrives at the accounting engine already correct.”

From the Actuals blog

SourcesCheckNew ERP
  • NL-30211€64.90, fee included
  • NL-30212€129.00, fee missing
  • NL-30207€48.50, in two batches

    Illustrative batch. “Verification happens before the ERP, so the ERP only receives data that has already been established as true.” From the Actuals blog.

    While the business keeps running

    Build the track while the train is moving.

    “Marinda’s Swiss tunnel metaphor stuck: you can build and adapt the tracks while the train is already moving. You don’t have to stop to scale.”

    Peter Engel, Founder & CEO, Actuals, after Finance Unlocked 2026
    Business events
    Reporting

    Two teams, digging towards each other.

    Uwe van Rensburg

    “You have to take a big bite at some point. Incremental doesn’t work at scale.”

    Uwe van Rensburg, Goboony, as told on the Actuals blog
    Peter Lem

    “Ask, ‘What’s the smallest change I can make that adds value?’”

    Peter Lem, Co-founder & CTO, Actuals

    Peter Engel calls it a paradox. A migration needs both: the big decision, and steps you can check one by one.

    How the switch runs

    From scoping to cutover, next to the process you run today.

    Click a step to see what happens in it.

    Your new ERP

    A typical implementation takes a few weeks for straightforward configurations and several months for complex multi-entity, multi-currency environments.

    Before you sign

    Four questions for any vendor.

    From the Actuals blog: “If a vendor cannot answer these with examples, the feature list does not matter.”

    0 of 4 asked

    Tick each question once you have asked it.

    Moving to a new ERP? The 15-minute Actuals scan shows where your numbers first stop matching, before they reach the new ledger.